Overview
Heavy equipment, set and piped.
Our crews rigged and set the cooling equipment with a crane and forklift, then ran and connected the condenser water and process piping along the building, with flanged connections, valves and insulation.
- Cooling tower & cooler setting
- Crane & forklift rigging
- Condenser water piping
- Flanged connections
- Valves & strainers
- Pipe insulation
- Scope
- Cooling equipment & piping
- Facility
- Industrial
- Equipment
- Evaporative cooler, process piping
- Media
- 6 photos · 5 videos
Photos
From the job site.
Tap any photo to see it full size.
Videos
On the job.
Planning cooling equipment or process piping?