Home / Projects / Cooling Tower & Process Piping

Cooling Tower & Process Piping

Evaporative cooler setting, condenser water piping and process piping connections at an industrial facility.

Overview

Heavy equipment, set and piped.

Our crews rigged and set the cooling equipment with a crane and forklift, then ran and connected the condenser water and process piping along the building, with flanged connections, valves and insulation.

  • Cooling tower & cooler setting
  • Crane & forklift rigging
  • Condenser water piping
  • Flanged connections
  • Valves & strainers
  • Pipe insulation
Scope
Cooling equipment & piping
Facility
Industrial
Equipment
Evaporative cooler, process piping
Media
6 photos · 5 videos
Photos

From the job site.

Tap any photo to see it full size.

Videos

On the job.

Connecting the cooler piping
Lifting the cooler with a crane
Crew on the piping work
Equipment along the building
Piping run at the cooler

Planning cooling equipment or process piping?

Send us your plans and specs for a mechanical proposal.

Request a Bid